Text
A defendant shall be punished by imprisonment for six months.
except that the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.
Reasons
Punishment of the crime
The defendant and co-defendant C wanted to forge and use a real estate lease contract, etc. as follows, thereby deceiving a lending institution by means of a crypizing it, and receive a deposit loan and settle their previous debts.
1. Forgery of private documents;
A. Co-defendant C (hereinafter referred to as “Defendant”) around December 10, 201, at the house of Seocho-gu Seoul Metropolitan Government, Seocho-gu and 1st floor, the Defendant and Co-Defendant C (hereinafter referred to as “Defendant”) had a borrower E to arrange for the loan in the real estate indication column in the real estate lease contract, “location: Seocho-gu Seoul Metropolitan Government 2 floor: land category: land category, land size: building: reinforced concrete building for structural use, size 73.08 square meters: 2 floor: 2 floor in the deposit column; 20 million won in the deposit column; 30 million won in the deposit column; 21 December 201 in the balance column, 201, 30 million won in the contract form; and 20 December 21, 2013 in the remainder column.”
“The date of preparation”, “The 10th day of December 201,” and “the address: the Seocho-gu Seoul Metropolitan Government D, resident registration number: F, telephone number: G, name: H, and the lessee’s column, and the Seocho-gu Seoul Metropolitan Government IAPT 803, resident registration number: K, telephone number: name and address: K, and name: A’s name and seal was affixed to H’s name.
B. On February 16, 2012, at the M Licensed Real Estate Agent Office located in Seocho-gu Seoul Metropolitan Government, the Defendants: “The location: The land category: the area of the land: the size of the building; the area of 264.4m2m2: the area of the building: the size of the structure brick, the size of the building: the area of the building: the area of the two floors; the total area of 286.7m2; the amount of KRW 20 million in the deposit column; the amount of KRW 10 million in the deposit column; the amount of the down payment shall be paid at the time of a contract; the amount of KRW 21 on December 21, 201; and the amount of KRW 10 million in the remainder column shall be paid on December 21, 2011; and the term column “from December 21, 2011 to December 21, 2013.”