logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2017.10.18 2017가단514285
보관금반환
Text

1. The defendant account number of the plaintiff and the defendant opened under the joint name of the plaintiff and the defendant.

Reasons

1. Evidence 【Evidence” 1, A2, A3, A4-1 through 3, A6-1, A15, A16-1, 2, and the purport of the whole pleadings;

A. On May 13, 2016, the Plaintiff entered into a sales contract between the Plaintiff and the Plaintiff and the Plaintiff, etc. (hereinafter “Plaintiff”) with the Defendant as an internal director.

(E) and in the case of Sung-si, F forest land 7,847 square meters (hereinafter referred to as “the instant forest”) and 7,847 square meters;

(2) At the time of the sales contract, the buyer D et al. concluded a contract to sell the instant land in D et al. with a sale price of approximately KRW 1,326 square meters ( approximately KRW 401 square meters) on the sales price of KRW 240,66 million. At the time of the sales contract, the buyer et al. agreed to pay the Plaintiff the remainder of KRW 21,6540,000,000 to the buyer on the contract date, and the buyer agreed to pay the seller the remainder of KRW 21,6540,000,000 to the buyer within one month after the alteration of the establishment, the completion of the civil works and the arrangement of official cadastral records in the name of the buyer. The form of civil works in the sales contract site (land use and the prevention of damage) and the contract to implement the seller’s cost and

3) According to the attached Form 1 drawings attached to a sales contract, the land owned by the Plaintiff on the left side of the instant land is to be developed as a factory site directly by the Plaintiff on the top side of the elevation, and the Defendant was to develop the right side part of the elevation which is lower than the elevation date into the factory site. (B) On December 8, 2016, the Plaintiff agreed to deposit D and D civil engineering works into the seller’s account in the presence of G and H on March 25, 2017 and complete the civil engineering complex construction works (hereinafter “road construction works in this case”) by carrying forward as of March 25, 2017 and completing the civil engineering complex construction works (hereinafter “road construction works”, including road concrete packaging and structure packing, etc.). The construction performance security amounting to KRW 42 million (Plaintiff 40 million for the seller’s purchase KRW 1.5 million) as a joint deposit in the buyer’s account.

(hereinafter, hereinafter “instant agreement”). 2 The Plaintiff on December 2016.

arrow