(영문) 수원지방법원 2020.11.17 2020가단522231
소유권말소등기
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Flue-gun Flue-si Flue-gun (hereinafter “Flue-si Gdong-gu”) prior to H 658 Flue-si (hereinafter “Flue-si”) with respect to the registration of the mother land and the split-off-off-related Gyeonggi-si (hereinafter “Flue-si”) was registered as the owner on the old land cadastre, but the Republic of Korea completed the registration of preservation of ownership on June 29, 1959 as the head of Suwon District Court’s Dong-gu registry office received on the same date.

On December 30, 1958, the mother land of this case was divided into three hundred and fifty-seven (381, J on December 30, 1958) and two hundred and seventy (277). On March 9, 1960, after the registration of ownership preservation was completed by the Defendant Republic of Korea, the entry in the title section of the H six hundred and fifty (658) was changed into L, three hundred and fifty (381).

As above, the farmland distribution has been made to M, a farmer, and the repayment has been completed, and the ownership transfer registration due to the completion of repayment in M in 1963 has been completed.

B. 277 square meters prior to K, which was divided into 277 square meters, was divided into 137 square meters prior to N on October 10, 1970 and 140 square meters prior to N on October 10, 197, and 137 square meters prior to N on June 20, 1983, was divided into 11 square meters prior to N on June 20, 1983, 289 square meters in P, Q, 42 square meters, and R, 11 square meters.

P large 289 square meters were merged with Q 42 square meters on September 25, 1991, and P large 331 square meters were divided into 331 square meters on September 16, 2009. P large 331 square meters was divided into 268 square meters on September 16, 2009.

On April 7, 2010, PJ 268 square meters are three different administrative districts and lot numbers are changed to three land in the above T-sized 63 square meters (the real estate indicated in paragraph (3) of the attached Table; hereinafter the same shall apply) in Suwon-si, Suwon-si. On August 27, 2019, the above C-sized 268 square meters was divided into the above C-sized 261 square meters (the real estate indicated in paragraph (1) of the attached Table; hereinafter the same shall apply) and the above E-gi 7 square meters (the real estate listed in paragraph (2) of the attached Table 2 of this case; hereinafter the same shall apply).

C. The registration status of each of the instant lands is as to each of the instant lands.