1. The Defendant’s acquisition by prescription on January 1, 2010 on each real estate listed in the separate sheet to the Plaintiff is based on the completion of acquisition by prescription.
Reasons
1. Basic facts
A. Land partitioning 1) Ulsan Jung-gu, Ulsan-gu, B 142 square meters (hereinafter “instant land before the instant partition”).
On September 23, 1987, this was divided into 42 square meters in Ulsan-gu B (139 square meters in size on the same day) and 100 square meters in Ulsan-gu C (331 square meters in size on the same day). 2) Ulsan-gu B (139 square meters in size on October 29, 1996, Ulsan-gu Ddong-dong (200 square meters in size on the same day from Jung-gu to Dong-gu; hereinafter referred to as "Dong-dong") B large 133 square meters in size (attached Form 1; hereinafter referred to as "land 1") and E large 6 square meters in size.
3) On October 29, 1996, C large 331 square meters is C large 308 square meters (attached Form 2; hereinafter “2 land”).
The combination of lands Nos. 1 and 2 below referred to as “each land of this case”
B) The registration of ownership transfer was completed on August 18, 194 with respect to the land of this case, which was owned by Japan on August 18, 194, and on September 23, 1987, the registration of ownership transfer was completed on September 11, 1948 (the date of first division of the land before the division) for the land of this case on September 23, 1987, for the land of this case on September 23, 1987, for the land of this case on the ground of “the reversion of the right on September 11, 1948.” (C) the registration of ownership transfer was completed on September 11, 1948 on the ground of “the right on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land of this case on the land register of this case on the 191).
On February 5, 1919, the old land cadastre 3 was determined by the J on February 5, 1919, and on August 18, 194, the ownership was transferred to H, and on September 7, 1945, the ownership was transferred to K, and on March 9, 1965, the ownership was transferred to I.
2) The land cadastre (A.) of Article 2.