logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2015.09.10 2014고단6094
상해등
Text

A defendant shall be punished by imprisonment for six months.

However, the execution of the above punishment shall be suspended for one year from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

On January 7, 2009, the Korea Electric Power Corporation (hereinafter “Korea Electric Power Corporation”) commenced construction works for power transmission lines in order to supply the power generated from the power station located in the area of Gyeongnam-gun, Nannam-gun to the Daegu Power Station and the senior Power Station, and completed construction works (basic, assembly, and inter-line construction works) with the exception of 23 nuclear power lines located in the area of each northwest-gun, Cheongbuk-do, from among the 40 power transmission towers.

On the other hand, Cheongdo residents and external organizations, such as the Cheongdo-gun residents and the Daegu Environmental Campaign Association, interfered with the construction of the above Samgyeong-ri 23 transmission towers, and the construction was suspended from July 3, 2012. On March 7, 2013, 222 organizations, such as the Green Party and the Daegu Environmental Campaign Association, jointly and severally formed the “Cheongdo-345kV Joint Measures Committee against the Cheongdo-do-345k transmission towers,” and on April 26, 2013, residents continued to engage in construction opposition and assembly assemblies.

On October 8, 2013, the Republic of Korea filed an application for provisional injunction against obstruction of construction with the opposing residents and the outside 23 persons with the Daegu District Court on the provisional injunction on March 20, 2014, and the construction resumed from July 21, 2014.

As a member of a green party, the Defendant is a person who is opposed to the Electric Transmission tower Corporation and participated in the demonstration.

1. From 05:00 on July 21, 2014 to 205:00 on the day before interfering with the injury and business, the project was performed to install fences around the construction site for the purpose of preventing the collision and accidents that may occur in the course of construction with the construction counterparts, and the installation of fences around the construction site for the purpose of preventing the collision and accidents that may occur in the course of construction with the construction counterparts.

At around 05:45 on the same day, the Defendant sent to the construction site at the above construction site at around 05:45, sent to the victim E (the age of 47) face, who was an employee of the Han River, who was engaged in the construction work, once using the hand floor, and inflicted injury on the victim, such as stringing gale, which requires approximately two weeks of treatment, at the same time.

arrow