Text
Defendants shall be punished by a fine of KRW 1,000,000.
In the event that the Defendants did not pay the above fine, each of them is 100.
Reasons
Punishment of the crime
On January 7, 2009, the Korea Electric Power Corporation commenced construction works for power transmission lines in order to supply the power generated from the power station located in Gyeongnam-gun's Sungsan-gun to the Daegu Power Station and the Aged Power Station, and completed construction works (basic, assembly, and inter-line construction works) with the exception of 23 equipment located in Cheongbuk-gun, Cheongbuk-do, respectively, from among the 40 power transmission towers.
On the other hand, the residents of the Cheonggyeong-do and the external organizations, such as the Daegu Environmental Campaign Association, interfered with the construction of the 23th nuclear transmission tower in the Pacific Ocean, and the construction was suspended from July 3, 2012. On March 7, 2013, 222 organizations, such as the Green Party and the Daegu Environmental Campaign Association, jointly and severally formed the “Cheongdo 345kV Joint Measures Council against the Cheongdo 345km,” and on April 26, 2013, a resident of the 21st residents of the Cheonggyeong-do, continued the construction opposition and assembly demonstration.
On October 8, 2013, the Korea Electric Power Corporation applied for a provisional injunction against obstruction of construction against the opposing residents and 23 external forces to the Daegu District Court for a provisional injunction against obstruction of construction. On March 20, 2014, the Korea Electric Power Corporation resumed the construction from around 05:00 on July 21, 2014.
The Defendants participated in the opposite demonstration as those who dissent from the construction of the transmission tower of the Plyeong-ri.
On August 7, 2014, at around 11:50 on August 7, 2014, the Defendants conspired with Cheongdo residents and external forces opposing the construction of transmission towers, and enter the site of the construction site at the site of the 23 construction site of the transmission tower located in Cheongdo-gun, Cheongdo-gun, Cheongdo-gun, in order for Defendant A to take the front part of the ready-mixed vehicle at hand, and Defendant B is unable to proceed with the vehicle at the front part of the ready-mixed vehicle, and Defendant B was in front of the vehicle, and Defendant B was in front of the vehicle, and Defendant B was in front of the vehicle with the Korea Electric Power Corporation employees who control himself.