(영문) 대전지방법원 천안지원 2017.04.21 2016가합100051
손해배상(기)
Text

1. The Defendant’s KRW 78,443,952 as well as the Plaintiff’s annual rate from July 18, 2014 to April 21, 2017, and the following.

Reasons

1. Basic facts

A. The Plaintiff is a dry field with a total of 8,80 square meters of 2,083 square meters, C 2,727 square meters, D 737 square meters, E 3,253 square meters, and a dry field with a total of 8,800 square meters (hereinafter “the ginseng field of this case”).

2) The Defendant is the executor who performed the instant bridge construction work in a size of about 18 meters in length, about 8 meters in height, and about 8m in width (hereinafter “H”, and the said re-construction work is referred to as “instant bridge construction work”). The Defendant is the executor who performed the instant bridge construction work, and the Boi comprehensive Construction Co., Ltd. (hereinafter “ Boi comprehensive Construction”) is the executor who performed the instant bridge construction work.

3) The Korea Land and Housing Corporation shall be deemed to be a construction project for housing site preparation of the K Tools with a size of 631,200 square meters in the area of 631,200 square meters from February 2013 in ia, Eup, and J-Myeon (hereinafter “instant housing site preparation project”).

(2) The Act on the Construction of Alternative Housing Co., Ltd. (hereinafter referred to as “alternative Construction”) is a project implementer.

(B) The contractor is the housing site creation work. (b) The main location description 1) the ginseng field of this case is adjacent to the same side of the ginseng field of this case, G is incorporated into F that flows out from the south side of the north.

The west side of the ginseng dry field of this case is at the site of the housing site development project of this case, and there are two-lanes from the north to the south (hereinafter “the road of this case”), and there is a road from the north to the south (hereinafter “the road of this case”), and there is a drainage channel (hereinafter “the drainage channel of this case”) on the side of the site construction site of this case among the roads of this case.

There are buildings such as furniture sales stores on the south side of the ginseng field of this case.

2) Drawings of the main location relating to the instant case are as shown in attached Table 1. C. The Defendant concluded a construction contract on October 28, 2013, setting the construction period as “from October 31, 2013 to February 28, 2014,” with the term “the construction period between the comprehensive construction and the comprehensive construction site.”