(영문) 대전지방법원천안지원 2015.12.18 2014가합2863
손해배상(기)
Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is a party’s position 1) The Plaintiff is the Plaintiff’s total 8,80 square meters of 2,083 square meters, C 2,727 square meters, D 737 square meters, E 3,253 square meters, and 8,800 square meters (hereinafter “instant ginseng field”).

(2) The Defendant Korea Land and Housing Corporation (hereinafter “Defendant Corporation”) from February 2013 to around 631,200 square meters in Asan-si and G G G 631,200 square meters (hereinafter “instant housing site development works”) is the executor of the H housing site development works (hereinafter “instant housing site construction works”).

Large Construction Co., Ltd. (hereinafter referred to as "large Construction") is the contractor of the construction of the housing site concerned.

3) Defendant Boi Construction Co., Ltd. (hereinafter “Defendant Boi Construction”).

) At the point where J, the chapter I’s chapter I’s chapter B, is in combination with I, K School Re-Installation Works consisting of approximately 18m in length, approximately 8m in height, and approximately 8m in width (hereinafter “instant bridge Work”).

(b) Major location description 1) The ginseng field of this case is adjacent to the same side of the ginseng field of this case, the J will flown at the south side of the north.

The west side of the ginseng dry field of this case is the site of the housing site development project of this case, and between them, a two-lane from the north to the south is the road (hereinafter “the road of this case”), and there is a drainage channel (hereinafter “the drainage channel of this case”) on the side of the site of the housing site development project of this case among the roads of this case.

There are buildings such as furniture sales stores on the south side of the ginseng field of this case.

2. Drawings of the main locations relating to the instant case are as shown in the drawings of the attached Form 1.

C. On October 28, 2013, the instant bridge construction contract was concluded between October 28, 2013 and the instant bridge construction, setting the construction period from October 31, 2013 to February 28, 2014.

Accordingly, the comprehensive construction of defendant Bolars can move temporarily during the construction period.

arrow