(영문) 대전지방법원천안지원 2015.12.18 2014가합4371
손해배상(기)
Text

1. Defendant Boan-si: (a) 103,536,024 won to Plaintiff A; (b) 352,148,756 won to Plaintiff B; and (c) 88,067.

Reasons

1. Basic facts

A. The party status 1) Plaintiff A is the Dong-gu Seoul Metropolitan Government D Ground Building (hereinafter referred to as “family store building”) in Yancheon-gu.

Plaintiff B is the owner of the above building, and Plaintiff B is the household store on the first floor below the above building (hereinafter “the instant household store”).

Plaintiff C Co., Ltd. (hereinafter “Plaintiff Co., Ltd”).

) A household store building is the building of E on the ground of Dong-gu, Nam-gu, Dong-gu, Seoul (hereinafter “Plaintiff Company building”) in the case of the immediate adjacent to the household store building, and is referred in common to the household store building.

(2) The Defendant Korea Land and Housing Corporation (hereinafter “Defendant Corporation”) is the executor of the construction of housing site in the H district of the H district of the size of 631,200 square meters in Masan City F and G G G, 31,200 square meters (hereinafter “instant housing site construction”) from February 2, 2013, and the Defendant Substitute Construction Co., Ltd. (hereinafter “Defendant Substitute Construction”) is the executor of the construction of the said housing site.

3) The Defendant Boan-si is the managing body of I and J, the branch of I, a local river, and K re-building installation works consisting of approximately 18m in length, approximately 8m in height, and approximately 8m in width (hereinafter “instant bridge construction”).

(2) The construction of the Defendant Company’s Corporation (hereinafter “Defendant Company’s Corporation”) shall be the implementer of the project.

(b) is the contractor of the above re- installation work. (b) Major position description 1) adjacent to the same side of the building of the plaintiffs, J will be incorporated into I that flows out from the south side of the building.

The west side of the building of the plaintiffs is at the site of the housing site preparation work in this case, and between them, a two-lane from the north to the south is a road (hereinafter referred to as the "road in this case"), and a drainage channel (hereinafter referred to as the "intersection") is set up on the side of the site preparation work site in this case among the roads in this case.

There are ginseng dry field on the north side of the plaintiffs' building.

2. Drawings of the major locations relating to the instant case are as shown in the separate sheet No. 1.