Text
Defendants shall be punished by imprisonment for eight months.
However, each of the above two years from the date this judgment became final and conclusive is against the Defendants.
Reasons
Punishment of the crime
Defendant
A is the representative director of the Fund in charge of the manufacture and sale of pumps, etc., and Defendant B is the head of the quality team of the Fund in charge of the dispute resolution and Defendant C is the purchase team leader of the Fund in charge of the dispute resolution.
When supplying goods, a person who has entered into a contract for the supply of goods requiring safety grade with the Korea hydroelectric Energy Co., Ltd. (hereinafter referred to as the "Korea Atomic Energy Co., Ltd.") shall submit documents for quality assurance, such as a test report, etc. issued by a domestic or foreign testing institution which verifies that the relevant goods have been manufactured using parts meeting the specifications and materials required in Korea-U.S., and shall not supply all the goods unless there is any quality assurance document for the relevant specifications of individual parts.
On May 24, 2005, around November 19, 2008, the Defendants concluded three supply contract prices for the equipment and other 12 kinds of nuclear power plants, which are installed in pipes connected to the charging pumps in order to alleviate the dynamic pressure of the pumps, which are the charging pumps, which are the product charging pumps, and the charging pumps, which are the product, and were installed in pipes connected to the reactor coolant system, to reduce the core pressure of water supply to the general public. The three supply contract prices for the equipment and other 12 kinds of nuclear power plants were 1,2 and new monthly 1,200 million won, 24,365 million won, 4,450 million won, 450 million won, and 450 million won, respectively, and the nuclear power plants were supplied to the buffer pumps department until 201.
During the process of purchasing the ice lease pipe, which is a material necessary for the manufacture of the charging pumps, the Defendants demanded that the Customer, the customer, prepare the pipes with a thickness of 1.1m, in conformity with the specifications required by Hanwon. However, they hear the horses that there should be imported from Japan, as there is no goods from Ghana lease.