logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 안양지원 2018.02.09 2014가합2087
공사대금 등
Text

1. The Defendant’s KRW 91,690,832 as well as the Plaintiff’s annual rate of KRW 5% from May 17, 2014 to February 9, 2018.

Reasons

1. Basic facts

1. Name of construction: New construction of a multi-household house at king C; and

2. The place of construction: Guang City C (D);

3. Construction cost: 650,000 won - Public charges to be used during the construction period - including insurance premiums, etc. - Electrical, gas and water measuring instruments for each household - Elevators separate for use of ground water - the condition that the entire construction cost will be borne by the Corporation.

4. Scope of construction project: based on the estimated tender content; and

5. Construction period: April 30, 2012 to September 30, 2012 (including construction after completion of construction).

6. Method of paying the construction cost: The amount equivalent to the construction cost shall be received by moving into a half-yearly, and the remainder shall be moved into a monthly; and

1. To execute construction works in accordance with design drawings;

(a) It shall be subject to the consent of the project owner when it is inevitable;

2. Domestic materials, such as steel bars, concrete, heat heating materials, pipes, etc. shall be used, and the heating materials shall be used as 100 milli;

3. A condition that the construction period shall be completed within five months.

4. The period for repairing defects in a building shall be three years after the completion of the building.

5. Any alteration, such as a rooftop room, shall be completed after completion and shall be completed within a construction period.

6. The outer wall of a building shall be its front seat and the rear side shall be built of a brick;

The interior materials shall be constructed at an interim level, and the selection of external funeral materials and internal funeral materials shall be consulted with the project owner.

7. The elevator shall be composed of eight seats E, and the owner of the building shall choose the purchase and design.

8. Separate designation of water supply personnel, industrial accident expenses, and surveying expenses;

A. On April 2012, the Plaintiff, a building business entity, concluded a construction contract with the Defendant, who is the owner of the building (hereinafter “instant construction contract”).

B. On April 25, 2012, the Defendant: (a) 266 square meters of a site area; (b) 154.45 square meters of a building site (land-to-land ratio: 58.06%) 390.82 square meters of a total floor area (floor ratio: 146.92%); (c) 11.84 square meters of a floor on the ground of reinforced concrete structure; (d) 11.84 square meters of a floor on the ground of reinforced concrete structure; (e) 2nd 143.6 square meters of a multi-family house (two households of multi-family house); (e) 124.25 square meters of a

arrow