(영문) 수원지방법원 안양지원 2018.02.09 2014가합101779
손해배상(기)
Text

1. Defendant B’s KRW 83,688,677 as well as 5% per annum from August 20, 2016 to February 9, 2018.

Reasons

1. Basic facts

1. Construction name: New construction of a multi-family housing unit at the king-si; and

2. Place of construction: Guang-si E (F);

3. Construction cost: 650,000 won - Public charges to be used during the construction period - including insurance premiums, etc. - Electrical, gas and water measuring instruments for each household - Elevators separate for use of ground water - the condition that the entire construction cost will be borne by the Corporation.

4. Scope of construction project: based on the estimated tender content; and

5. Construction period: April 30, 2012 to September 30, 2012 (including construction after completion of construction).

6. Method of paying the construction cost: The amount equivalent to the construction cost shall be received by moving into a half-yearly, and the remainder shall be moved into a monthly; and

1. To execute construction works in accordance with design drawings;

(a) It shall be subject to the consent of the project owner when it is inevitable;

2. Domestic materials, such as steel bars, concrete, heat heating materials, pipes, etc. shall be used, and the heating materials shall be used as 100 milli;

3. A condition that the construction period shall be completed within five months.

4. The period for repairing defects in a building shall be three years after the completion of the building.

5. Any alteration, such as a rooftop room, shall be completed after completion and shall be completed within a construction period.

6. The outer wall of a building shall be its front seat and the rear side shall be built of a brick;

The interior materials shall be constructed at an interim level, and the selection of external funeral materials and internal funeral materials shall be consulted with the project owner.

7. The elevator shall be composed of eight persons G, and the owner of the building shall choose the purchase and the design.

8. Separate designation of water supply personnel, industrial accident expenses, and surveying expenses;

A. On April 2012, Defendant B, a building business owner, concluded a construction contract with the Plaintiff, which is the owner of the building (hereinafter “instant construction contract”).

B. On April 25, 2012, the Plaintiff: 266 square meters of a site area; 154.45 square meters of a building site (land-to-land ratio: 58.06%); 390.82 square meters of a total floor area (floor ratio: 146.92%); 11.84 square meters of a floor on the ground of reinforced concrete structure; 11.84 square meters of a floor on the ground of reinforced concrete structure; 143.6 square meters of a multi-family house (two households of a multi-family house); 124.25 square meters of a multi-family house on the ground (one household); 4th floor on the ground.