logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 안양지원 2016.01.14 2015고단118
업무상과실치사
Text

Defendant

A and B shall be punished by imprisonment without prison labor for ten months, and by imprisonment without prison labor for one year.

, however, from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

Defendant

A serves as an engineer of the Korean Railroad Corporation I J Headquarters, Defendant B serves as an assistant engineer of the same headquarters work office, Defendant D, and C are K staff of the same headquarters.

Defendants were on the line No. 4 of the mother line between May 24, 2014 and 15:30.

Article 2 subparag. 13 of the rolling stock Operation Rules (hereinafter “the entry and exchange work in this case”) of the 29th class, which is conducted to separate defective vehicles from the 3th class of the 16th class and the 16th class of the 16th class of the vehicles, or to connect or separate vehicles by using power vehicles (Article 2 subparag. 13 of the rolling stock Operation Rules).

The entry and exchange work first connects the 16th amount of the difference between the exchange engine and the 16th amount of the difference, and the 17th amount of the difference between the 16th amount of the difference and the 16th amount of the difference between the exchange engine and the 16th amount of the difference, and the exchange engine moved the 16th amount of the connected 1 to the 2nd line, and separate the 3th amount of the defective 16th amount of the difference from the 4th line and connects the 15th amount and 17th amount of the difference.

When making a refund, the engineer, assistant engineer, and participating service personnel shall hold a exchange consultation on their own surface in advance, and in particular, refer to the signals of the J KMM under Article 10 of the Regulations on Operation of the KMMM (Article 76 subparagraph 2 of the Regulations on Operation of rolling stock). He/she shall consult in detail on the current location, track condition, the host vehicle, and the directions for the replacement of the input vehicle, and in principle, he/she shall use the radio signal concurrently with the former heading and the former heading; Article 23 of the Regulations on Operation of the JMM; Article 11 of the Regulations on Operation of the JMM; Article 10 of the Rules on Operation of the JMM; and Article 10 of the Rules on Operation of rolling stock; and Article 10 of the Rules on Operation of the engine and assistant engineer shall be pointed out and responded with each other; and Article 10 of the Rules on Operation of rolling stock shall be dealt with within the JMMMMM.

arrow