logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2014.05.28 2011가합135870
손해배상
Text

1. Defendant B’s KRW 83,942,119 for the Plaintiff and KRW 5% per annum from June 26, 2008 to May 28, 2014.

Reasons

1. Facts of recognition;

A. The parties’ related Plaintiff is a person who respectively implemented the 4th floor E (hereinafter “Defendant D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D’s correction and treatment from Defendant C, and the 4th floor B of the same building operated by Defendant B D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D’s scop-up cutting of the mas award from Defendant B (hereinafter “Defendant D D D D D D D D”).

B. 1) On July 14, 2007, the Plaintiff visited the Defendant Dental and Defendant Dental to receive the diagnosis of the congenital loss of the congenital 3rd degree sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic sacratic, and the Defendants planned the Plaintiff to take charge of the Plaintiff’s corrective treatment including the first sacratic sacratic sacratic on the upper left and right side, and the instant operation and the instant sacracracracr sacr s

3) From July 21, 2007 to June 23, 2008, Defendant C provided the Plaintiff with the malutical and malutical therapy. 4) Defendant C provided the Plaintiff with the malutical therapy from August 4, 2008 to December 6, 2008, after the Plaintiff received the instant surgery and the instant malutical surgery.

C. 1) On June 25, 2008, after the Plaintiff received corrective treatment from Defendant C, Defendant B confirmed that there was no opinion above the threshold through the surgery before the surgery, and Defendant B performed the instant surgery and the instant clinical surgery. However, in the process of the instant surgery, the Plaintiff’s upper part of the body was cut off, and the Defendant B fixed the structural part to a fixed board and a fixed company, and completed the surgery. 2) From June 27, 2008, Defendant B continued to perform the surgery with the Plaintiff from June 27, 2008 to the Plaintiff.

arrow