Text
1. Among the real estate listed in the separate sheet No. 1, to the plaintiffs
(a) Defendant F shall indicate the attached Form 1 drawings (1), (2), (3), (3), (5).
Reasons
Basic Facts
1) Each land listed in paragraphs 1 and 7 of Attached Table 2 (hereinafter referred to as “G/H land”) shall be the grounds for the extension of the building.
(ii) Two general restaurants on the steel frame slley roof 2, 237.13 square meters on 1st 237.13 square meters on 2nd 284.90 square meters on 1st 2nd 2nd 2nd 2nd 284.90 square meters on 1st 1st 2nd 2nd 28.672 square meters on 1st 24.78 square meters on public restaurants on 1st 1st 2nd 2nd 2nd 1st 2nd 2nd 2,24.78 square meters on prefabricated, 24.94 square meters on prefabricated type 2nd 2nd 3rd 2nd 2nd 2nd 2,512.70 square meters on 3rd 276.14 square meters on 14th 2nd 3rd 2nd 3rd 2nd 3rd 2nd 3rd 3rd 2nd 2nd 3rd 3rd 2.
On January 28, 1987, I completed the registration of ownership transfer under I’s name. 2) On April 1995, I newly constructed a steel structure and a string wall structure, 264 square meters, 264 square meters, 72 square meters in a second floor for viewing assembly facilities of the first floor (e.g., wedding), and 72 square meters in a second floor (hereinafter “the instant additional 1 building”).
3) On October 16, 1995, Defendant E completed the registration of ownership transfer with respect to the instant existing building and the instant additional 1 building. (4) On December 23, 1997, Defendant E extended a building of 202.08 square meters and 264.69 square meters of the instant additional 1 building (hereinafter “the instant additional 2 building”) to connect the said two buildings between Samdong-dong and the instant additional 1 building.
(A) The building of this case and the building added 1 and 2 together were combined to “the new building of this case.” Accordingly, the building of this case among the building register on the existing building of this case was changed to “Ddong” (or Ddong) that reflects the details of the building of this case 1 and 2 as indicated below.
(hereinafter referred to as “instant new building D”). Such extension is conducted.