logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2020.10.16 2019가합204511
손해배상(기)
Text

The defendant shall pay 8,771,400 won to the plaintiff and 6% per annum from May 16, 2019 to October 16, 2020, and the following day.

Reasons

Basic Facts

A. The Plaintiff is a company that operates the business of manufacturing solar power generation facilities, and the Defendant is a company that operates the business of constructing solar power generation facilities.

B. On June 17, 2016, “the contract for construction work” written under the name of the Plaintiff and the Defendant, the following is indicated that the Defendant constructed solar power generation facilities (9kw 6) on the ground of Youngcheon-si Co., Ltd. (hereinafter “instant land”) and transfers the same to the Plaintiff along with the instant land:

(hereinafter) On June 17, 2016, the construction contract is “instant contract” and the contract indicated by the instant contract is “instant contract”: Plaintiff / B: Defendant 1 (Name of Construction Work) for solar power generation facilities construction (9W6) in Yongcheon-si, Youngcheon-si: The place where installation of solar power plants, E-solar power plants, F-solar power plants, G-solar power plants, H-solar power plants, and I-solar power plants is installed: Article 2 (Work Price), Article 3 (Additional Value-Added Tax), 1,230,00,00 won (excluding Value-Added Tax), from June 17, 2016 to June 30, 2017 (hereinafter “instant contract”): All kinds of land and materials required to be installed within the scope of permission and installation of installation of installation and installation of installation and installation of installation and installation and installation of installation and installation of installation and installation and installation of installation and installation of installation and installation (10% prior to the completion of installation and installation/40% of installation works).

3) B bears the cost of outboard construction, which is a system-linked design cost for the Korea Electric Power Corporation. Article 8 (In cases where the repayment of delay B fails to complete the construction on its own account within the construction period, it falls under 3/100 of the down payment every day from the following day to the completion thereof.

arrow