(영문) 광주지방법원 2019.11.01 2019가합52275
계약금 등 반환 청구의 소
Text

1. The Defendant: (a) KRW 320,00,000 for the Plaintiff and the Plaintiff’s KRW 6% per annum from September 13, 2018 to March 29, 2019; and (b) March 30, 2019.

Reasons

. The instant contract refers to “the instant contract.”

(6) The main contents of the instant contract are as follows: ① Payment Terms and Conditions of the down payment (excluding value-added tax) - KRW 165,00,00 (at the time of completion of the design and power generation permission) - Payment period for the first intermediate payment of KRW 155,00,000 (at the time of preparation for the second intermediate payment of works) - Payment period of KRW 280,000 for the second intermediate payment of KRW 280,000, and payment within seven days after the completion of the civil works (at the time of preparation for the second intermediate payment of works, the date of completion of the construction works, the processing and drawing of the structures, the electrical construction works, the order of the structures and the rupture of the structures) - Payment period of the fixed-term electrical construction installation (at the time of the order of installation of the structures and the installation of the electric distribution system) - Payment period of all the terms and conditions of the contract for electrical construction works to be supplied to banks for 1,2000,09.

3. Part not included in the construction (the territory of the Plaintiff) ① the progress of the RPS tender.

arrow