(영문) 인천지방법원 2019.05.28 2017가합243
손해배상(의)
Text

1. The Defendant’s KRW 157,857,287 as well as the Plaintiff’s annual rate from April 7, 2013 to May 28, 2019, and the following.

Reasons

1. Basic facts

가. 원고의 피고 병원에서의 수술 및 진료 경과 1) 원고는 2013. 4. 4. 휜다리 교정을 위해 피고가 운영하는 C정형외과(이하 ‘피고 병원’이라 한다

The medical personnel of the Defendant Hospital was fested to the Plaintiff, and the medical personnel of the Defendant Hospital did not perform the surgery of this case on April 5, 2013 on both sides under the diagnosis of anti-information of the suss of both sides of the Plaintiff (hereinafter “instant surgery”).

(2) Since April 7, 2013 after the instant surgery, the Plaintiff complained of the pass of each bridge from April 7, 2013, and on April 9, 2013, the symptoms of the sacrife and the sacrife and the sacrife species were revealed on both sides, but the medical personnel of the Defendant hospital did not take any particular measure other than reducing the sacrife.

On April 10, 2013, the medical professionals of the Defendant Hospital, who appeared to be accompanied by severe pains to the Plaintiff, judged that there was a serious corrosion in the inner part of the surgery while suspected of malleging madar madar madar madar madar madar madar, and that the Plaintiff’s bridge madring, pressure ruping, ruping, and rupture madar madar madar madar madar.

3) After that, the Plaintiff consistently complained of symptoms that the left floor angle of the upper left is lowered, that is, no scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopic scopicscopic scopicscopics, and that on April 24, 2013, the Plaintiff was discharged from the Defendant Hospital on the first day after the discharge. On July 30, 2013, the sudden scopic scopic scopic scopic scopic scopic scopic sc

B. On August 21, 2013, the Plaintiff: (a) was diagnosed with Magnenene’s disease on the ground of the left-hand adequate sewage on August 21, 2013; (b) as a result of the Magne’s and the Magne’s examination, the Plaintiff was transferred to the E Hospital on October 15, 2013; and (c) the Plaintiff was transferred to the hospital.