logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2017.02.15 2016고단1476
수질및수생태계보전에관한법률위반
Text

Defendants shall be punished by a fine of KRW 7,000,000.

Defendant

If A does not pay the above fine, it shall be 100.

Reasons

Punishment of the crime

Defendant

A is the representative director of the corporation B in Kimhae-si F, and the defendant B is a corporation established for the purpose of manufacturing motor vehicle parts.

It is difficult to maintain environmental standards due to water pollutants discharged from discharge facilities in the upper region of the water source protection area, special measures area and the upper region of the special measures area, areas where water intake facilities are installed, and the upper region of the water source protection area, or there is a

The Minister of Environment may not install emission facilities discharging specific water-quality harmful substances in an area designated as "area subject to the restriction on the installation of emission facilities", and a person who intends to install other emission facilities shall obtain permission from the Minister of Environment as prescribed by Presidential Decree.

1. From August 27, 2010 to March 24, 2016, Defendant A, the Minister of Environment, designated the Defendant’s management company located in Kimhae-siF as an area subject to the restriction on the installation of wastewater discharging facilities from the river basin under the river basin, without obtaining permission for the installation of wastewater discharging facilities, and even if the installation of wastewater discharging facilities is restricted by discharging specific water-related harmful substances more than the standard concentration, Defendant A installed 21 MCT smuggling 21 and 19 BNC lines (in cubic volume 6.468 cubic meters of water storage capacity) and 1.72 cubic volume of water storage.

2. Defendant B, a representative director, in relation to the Defendant’s business at the same time and place as in the preceding paragraph, did not obtain permission to install wastewater discharge facilities as above, and even if the installation of wastewater discharge facilities was restricted by discharging specific water-quality harmful substances more than the standard concentration, Defendant B, as well as MCT smuggling 21 (6.468 cubic meters of water storage capacity) and CNC line 19 (1.72 cubic meters of water storage capacity).

Summary of Evidence

1. Statement by the defendant in court;

1. Written statements, certificates of violation, certificates of sample collection;

arrow