(영문) 창원지방법원 2017.05.19 2016고단1474
수질및수생태계보전에관한법률위반
Text

Defendants shall be punished by a fine of three million won.

Defendant

If A does not pay the above fine, 100,000.

Reasons

Punishment of the crime

Defendant

A is the representative director of (State)B in the window E of Changwon-si, and Defendant (State)B is a corporation established for the purpose of manufacturing heavy equipment parts.

It is difficult to maintain environmental standards due to water pollutants discharged from discharge facilities in the upper region of the water source protection area, special measures area and the upper region of the special measures area, areas where water intake facilities are installed, and the upper region of the water source protection area, or there is a

The Minister of Environment may not install emission facilities discharging specific water-quality harmful substances in an area designated as "area subject to the restriction on the installation of emission facilities", and a person who intends to install other emission facilities shall obtain permission from the Minister of Environment as prescribed by Presidential Decree.

1. From November 26, 2015 to March 23, 2016, Defendant A established 21 20 mars in the CNC line line line (2.1 metres in the water storage capacity) and 10 mars in the MCT line (1.4 mar of the water storage capacity) (1.4 marb of the water storage capacity), despite the fact that the Minister of Environment, from around November 26, 2015 to around March 23, 2016, Defendant A operated the wastewater discharge facilities without obtaining permission for the installation of wastewater discharge facilities from the window E in the Changwon city, which was designated by the Minister of Environment as an area subject to the restriction on the installation of wastewater discharge facilities from the river basin below the river basin.

2. The Defendant (State) set up and operated the 21st half of the CNC Line (2.1 cubic metres Storage Capacity 2.1 cubic metres) and the 10th half of the CT Line (1.4 cubic metres Storage Capacity 1.4 cubic metres) without obtaining permission for the installation of wastewater discharge facilities as above, and even if the installation of wastewater discharge facilities is restricted by discharging specific water-quality harmful substances more than the standard concentration, at the same time and place as in the preceding paragraph.

Summary of Evidence

1. Each legal statement of witness F and G;

1. The protocol concerning the interrogation of the suspect against the defendant A;