logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2017.05.19 2016고단1475
수질및수생태계보전에관한법률위반
Text

Defendants shall be punished by a fine of three million won.

Defendant

If A does not pay the above fine, 100,000.

Reasons

Punishment of the crime

Defendant

A is the representative director of (state) B in the window E of Changwon-si, and the defendant (state)B is a corporation established for the purpose of manufacturing weapons and guns.

It is difficult to maintain environmental standards due to water pollutants discharged from discharge facilities in the upper region of the water source protection area, special measures area and the upper region of the special measures area, areas where water intake facilities are installed, and the upper region of the water source protection area, or there is a

The Minister of Environment may not install emission facilities discharging specific water-quality harmful substances in an area designated as "area subject to the restriction on the installation of emission facilities", and a person who intends to install other emission facilities shall obtain permission from the Minister of Environment as prescribed by Presidential Decree.

1. From September 29, 2014 to March 24, 2016, Defendant A, the Minister of Environment, at the window E of Changwon-si, designated as an area subject to the restriction on the installation of wastewater discharging facilities from the river basin below the river basin, Defendant A, without obtaining permission for the installation of wastewater discharging facilities, and limited the installation of wastewater discharging facilities by discharging more than a certain level of harmful substance than a standard concentration. However, Defendant A installed 10 vehicles in the MCT Line and 30 vehicles in the CNC Line (or 1.4 cubic meters in the capacity of storage of receptored oil), and 1.8 vehicles in the CNC Line (1.4 cubic meters in the capacity of storage of receptored oil).

2. The Defendant (State) set up ten parts of the MCT Line (1.88 cubic metres) and thirty parts of the CNC Line (1.44 cubic metres) and thirty parts of the CNC Line (1.44 metres) without obtaining permission to install wastewater discharge facilities as above, even if the Defendant, the representative director, in relation to the person’s business at the same time and place as in the preceding paragraph, was limited to the installation of wastewater discharge facilities by discharging specific water-quality harmful substances more than the standard concentration.

Summary of Evidence

1. A protocol concerning suspect interrogation of the defendant A by the prosecution;

1. The investigation report (explosive oil).

arrow