logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2019.07.10 2018가단5032718
구상금
Text

1. The Defendant’s KRW 25,060,437 as well as 5% per annum from January 20, 2018 to July 10, 2019 to the Plaintiff.

Reasons

1. Basic facts

A. 1) The Plaintiff is an insurance company and C (in the case of a stock company, the entry of the stock company is omitted.

B) The insured Party C, the insurance period from March 28, 2017 to March 28, 202, 202, and the amount of insurance coverage as to the subject matter and the amount of insurance coverage, shall be 420 square meters of the building (hereinafter “the instant multi-dong building”) of the steel frame of the steel frame of the steel frame of the Sincheon-si D located in Macheon-si owned C, and the sand position plate building (hereinafter “instant multi-dong building”).

As to the subject matter of insurance, E insurance contract (hereinafter “instant insurance contract”) provides for KRW 200,000,000 for the movable property within the instant multi-unit building, and provides for KRW 100,000,000 for the subject matter of insurance to compensate for the damage upon the occurrence of a fire (hereinafter “instant insurance contract”).

2) C used the instant multi-family building as a warehouse and foundation, or a place of business that rewing the instant multi-family building as an enterprise manufacturing and delivering furnitures, such as small wave, etc., and was connected with a pipe pole, pipe pole (285m2) on the right side of the instant multi-family building. Within a warehouse and a place of business, finished products such as raw materials, re-processed goods in the form of foundation and re-sponsing, sponsing, etc. were shared.

B. 1) The Defendant, who is engaged in the household manufacturing business, etc. with the trade name “F”, runs the instant fire manufacturing business, etc., shall be the building of the steel-frame structure D located in Spocheon-si, Spocheon-si (hereinafter “instant operating building”).

) 일부를 무상으로 빌려 점유하면서 C로부터 공급받은 소파틀에 스펀지와 원피를 재단하여 조립하는 작업을 수행하였다. C G I 2) 피고가 2017. 12. 11. 08:10경 이 사건 가동건물에 설치된 선풍기형 전기히터를 켠 직후 연결된 배선에서 스파크가 발생하고 이로 인하여 화재(이하 ‘이 사건 화재’라 한다)가 발생하여 이 사건 가동건물 전체로 확대되고, 이후 아래 그림과 같이 인접한 C 소유의 가, 나, 다동 건물 3개 동과 가설건축물 1개 동, 소파 완제품과 자재 등 합계 900,000...

arrow