logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2017.11.09 2017고단1269
업무방해
Text

A defendant shall be punished by imprisonment for four months.

However, the execution of the above punishment shall be suspended for a period of two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

The defendant is the resident of the C apartment in Busan Metropolitan City, and D Co., Ltd. is the company that entered into a contract for the management office of the above apartment and the repair and reconstruction of the apartment on August 10, 2016.

1. On September 1, 2016, around 09:00, the Defendant: (a) obstructed the front of the above apartment elevator on the ground that the Defendant, around 09:00 on September 1, 2016, was in the construction site for the outer slope and high pressure washing of the C apartment; (b) obstructed the front of the above apartment elevator on the ground that the victim had been performing construction works to E, etc.; and (c) prevented the parts of the above apartment from going up on the rooftop; and (d) discarded

"Along with the fact that the parts of the people are unable to perform construction works by putting a large amount of disturbance and avoiding disturbance, it interfered with the victim's collapseing construction works by force for about one hour.

2. The Defendant: (a) around 08:00 on October 25, 2016, at the construction site of the above C Apartment C apartment 102, and (b) on the ground that the victim carried out construction works to the warden F, etc. at the construction site, leaving the above apartment 102 elevator by leaving the above apartment 102 elevator in his body and preventing the body from going up; and (c) “Mara, 102, which does not carry out construction works with high habiting, re-hacked, 102, the construction of which

“Along with the fact that the construction should be discontinued by placing the large interest, gathering neighboring residents at the construction site, and instigating them to stop the construction, thereby obstructing the installation of the disturbance, thereby obstructing approximately 30-40 minutes of painting work by force.

3. On November 25, 2016, around 10:00, the Defendant: (a) was at the 106 dong-style painting construction site; and (b) on the ground that the victim carried out construction works to the Company F, etc. at the site site, the Defendant’s “The construction is suspended and d, flap, flap’s shot, and wres are replaced by fraud; and (c) the Defendant’s wres and hacked down the construction; and

In order to avoid disturbance such as “nicker,” the body of the body of the body of the body of the body of the body of the body of the body of the body of the body of the body of the body of the body of the body of the body.

Summary of Evidence

1. Each legal statement of witness G, H, F, I, and E;

1. 112 Reporting Form A, A.

arrow