Text
Defendants shall be punished by a fine of KRW 5,000,000.
Defendant
If A does not pay the above fine, it shall be 100.
Reasons
Punishment of the crime
Defendant
A is a corporation established for the purpose of manufacturing motor vehicle parts, etc., as the representative director B and the defendant B in Kimhae-si F.
It is difficult to maintain environmental standards due to water pollutants discharged from discharge facilities in the upper region of the water source protection area, special measures area and the upper region of the special measures area, areas where water intake facilities are installed, and the upper region of the water source protection area, or there is a
The Minister of Environment may not install discharge facilities that discharge specific water-quality harmful substances in an area designated as "area subject to the restriction on the installation of discharge facilities", and a person who intends to install other discharge facilities shall obtain permission from the Minister of Environment as prescribed by Presidential Decree.
1. From August 11, 2015 to March 23, 2016, the Defendant established 24 parts of the CNC Line Line Line (2.8 metres, 120 L/W/W) with the Defendant’s management company located in the Kimhae-si F, designated as an area subject to the restriction on the installation of wastewater discharge facilities in the river basin below the river basin, without obtaining permission for the installation of wastewater discharge facilities, and even if the installation of wastewater discharge facilities is restricted by discharging specific water harmful substances more than the standard concentration, Defendant A operated the wastewater discharge facilities.
2. Defendant B, a representative director, in relation to the Defendant’s business at the same date, time, and place as in the preceding paragraph, did not obtain permission to install wastewater discharge facilities as above, and even if the installation of wastewater discharge facilities was restricted by discharging specific water-quality harmful substances more than the standard concentration, Defendant B, a representative director, installed 24 24 metres of CNC Line (total capacity of 2.8 metres, total capacity of 120 metres/
Summary of Evidence
1. Statement by the defendant in court;
1. Statement, written confirmation of violation, written confirmation of collection of samples, and environmental-related violation photographs;
1. Investigation report (report accompanied by a report on the results of an examination of waste water (passing to the water level), photographs of examination samples of wastewater, and reports on wastewater inspection; 1.03.