(영문) 서울중앙지방법원 2016.04.08 2015가합554059
분양대금
Text

1. The Plaintiff:

A. As to Defendant B’s KRW 364,805,484 and KRW 131,525,00 among them, from January 1, 2013 to April 8, 2016.

Reasons

1. Basic facts

A. The sales order and option construction contract No. 1 B 102, 901, 200 2 C 110, 1304, 26 February 26, 2010, 200 2 C 110, 328,180,001) the Plaintiff newly constructed, Jung-gu Incheon Metropolitan City, which the Plaintiff newly built (hereinafter “instant apartment”).

As to the Defendants, the sales contract in question (hereinafter “instant sales contract”) with the Defendants as follows.

(2) The Defendants paid 16,400,000 won each as down payment to the Plaintiff on the date of conclusion of the instant sales contract, and thereafter, the intermediate payment was paid six times, and the remainder was agreed to be paid on the date of designation of occupancy as determined by the Plaintiff.

The payment period of KRW C 32,650,800 (total KRW 195,900,000) 115,880,000 (total KRW 195,90,000) on the date of the designation of occupancy on December 15, 2015, 201, December 15, 201, 201, respectively, of KRW 32,650,00 (total KRW 195,90,000) (total KRW 195,90,000) on September 15, 201, 201, the remainder of the second part of the third part of the second part of the second part of the second part of the second part of the second part of the second part of the second part, the remainder of the sixth part of the fifth part of the second part, 2010.

3) In addition, the Defendants are referred to as the “instant options construction contract” under the contract for the expansion of balcony and the installation of system air conditioners (hereinafter collectively referred to as the “instant options construction contract”).

The contract deposit was concluded, and the contract deposit was paid to the Plaintiff respectively. The contract of this case was concluded with the Plaintiff on June 6, 2010, total sum of the remainder of the contract date of the type of the Defendant contract (the designated date of occupancy) 2,470,00 won in the B balcony expansion 9,916,000 won in the aggregate of KRW 15,645,000 on June 6, 2010, KRW 5,729,000 in the C balcony extension of KRW 5,729,00 on June 6, 2010, at least 16,916,00 won in the remainder of KRW 17,326,000 on July 1, 2010, at least 16, 916,326,000 won in the remainder of KRW 98% in the deposit interest rate of at least 196% in the remainder of KRW 169,50% in the deposit interest rate of KRW 196.36% in the deposit interest rate (A).