(영문) 부산고등법원 2018.04.26 2017나54909
물품인도
Text

1. The defendant is paid KRW 17,419,860 by the plaintiff upon a claim for a change in exchange in this court.

Reasons

1. Basic facts

A. The Plaintiff is a non-profit incorporated association established for the purpose of ensuring the safety of construction of the temporary materials and developing the temporary industry. The Defendant is a company that manufactures and processes aluminium materials and finished products.

B. On December 3, 2012, the Plaintiff and the Defendant, etc. entered into an agreement on the development of system non-domesticization (hereinafter “instant business agreement”) with the Defendant and the New Metal Co., Ltd. (hereinafter “New Metal,” collectively with the Defendant, etc.) on the “Development of Domestic Substitute Products in the System Non-Korean System Non-Korean System Non-Korean (hereinafter “instant business agreement”).

The main contents of the instant Work Convention are as follows.

Written Convention on the Domesticization, etc. of Non-Systems of Boiler Exclusive System

2. The Plaintiff shall take charge of the design, performance test, and all technical assistance of the system vision suitable for boiler characteristics and meeting the safety certification standards.

3. In cooperation with the Association and new metal, the Defendant shall take charge of the design, parts processing and assembly of each constituent element for the production of finished products of the system non-system designed.

4. The new solar metals shall be in charge of gold production and voltageing for the production of unsatisfyings of systems designed in collaboration with the plaintiff and the defendant.

Scope of Duties of the Joint Convention (MOU)

3. Technical support related to the installation and use of the vision of each unit design and safety certification system of the Plaintiff’s main role-building organization in each relevant person’s major development scope and content, and the design and testing system of the Plaintiff’s main role-building organization, and the installation and use of the system for performing performance and safety certification for Defendant’s processing and assembly systems, for the manufacture of non-structured parts of the system, and the supply of non-manufactured parts of the system for manufacturing the finished parts of the system, and pressure-generating for the manufacture of non-systems for the manufacturing of non-structured parts of the system;

C. The submission of the instant implementation plan and the cooperative research and development in this case.