1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Basic Facts

The plaintiff is a non-profit incorporated association established for the purpose of securing the safety of construction of the provisional structure and developing the provisional industry, and the defendant is a company engaged in the manufacture of aluminium parts, Aluminium parts, a drum, a rail, a rail, a fence, and a sloid manufacturing business.

From November 1, 2012 to November 14, 2012, the Korea Medium and South East Power Generation Co., Ltd., the Korea Western Power Generation Co., Ltd., the Korea Western Power Generation Co., Ltd., the Korea Western Power Development Co., Ltd., the Korea Western Power Development Co., Ltd., the Korea Southern Power Co., Ltd., Ltd., the Korea Southern Power Co., Ltd., the Korea Southern Power Generation Co., Ltd., Ltd., and the Korea East Western Power Development Co., Ltd., Ltd. (hereinafter referred to as the “Development Co., Ltd

On December 3, 2012, the Plaintiff concluded an agreement with the Defendant and the Newyang Metal Co., Ltd. (hereinafter referred to as “new metal,” collectively with the Defendant, etc.) on the “Development of Domestic Substitute Products in the Non-Korean System Non-System for the Internal Inspection of the Engine Boiler System” (hereinafter referred to as the “instant Business Agreement”) and participated in the instant recruitment after forming a consortium.

The main contents of the instant business agreement are as follows.

Written Convention on the Domesticization, etc. of Non-Systems of Boiler Exclusive System

2. The Plaintiff shall take charge of the design, performance test, and all technical assistance of the system vision suitable for boiler characteristics and meeting the safety certification standards.

3. In cooperation with the Association and new metal, the Defendant shall take charge of the design, parts processing and assembly of each constituent element for the production of finished products of the system non-system designed.

4. The new solar metals shall be in charge of gold production and voltageing for the production of unsatisfyings of systems designed in collaboration with the plaintiff and the defendant.

Scope of Duties of the Joint Convention (MOU)

3. The performance test of each composition design system of the Plaintiff’s design and test system vision, which is the scope of development of major role-based organizations by relevant persons, shall be conducted by the non-performance test of each unit design system.