logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2019.11.22 2018나50369
주차면표기삭제 등
Text

1. All appeals filed by the plaintiff and the defendant and the plaintiff's claims expanded in this court are dismissed.

2. The plaintiff is the plaintiff.

Reasons

1. The reasoning of the court of first instance’s explanation concerning the instant case is as follows, and thus, the judgment of the court of first instance is cited in accordance with the main sentence of Article 420 of the Civil Procedure Act, as it is, in addition to the reasoning of the court of first instance.

Part 4 of the first instance judgment, the last sentence of the 15th sentence is as follows.

The appeal of F was filed by F, but the Busan High Court dismissed the appeal on September 27, 2019, and the above decision was finalized as it is (2018Ra5027). The fourth-party 16 of the first instance judgment of "No. 4 of the first instance judgment of "No. 16 of "No. 16 of the Witness J's testimony and the result of the on-site inspection of this court" is added to "the

The first-class, first-class, second-class, and second-class are as follows.

From June 1, 2015 to January 31, 2019, 145,027,93 won (i.e., KRW 190,97,000 x less than KRW 75.94% x less than KRW 75.94% x less than KRW 3,467,420 each month from February 1, 2019 to the completion of interference (i.e., KRW 4,56,00 x 75.94%) for payment of money calculated at the rate of KRW 3,467,420 each month (i.e., KRW 4,56,00 x 75.94%) of the judgment of the first instance (the portion of the monetary claim) is as follows.

From the time of construction, the instant building was installed by dividing the power distribution team for apartment and the power distribution team for commercial buildings into two sections on each underground floor, and two sections on each underground floor were installed. All sections on the 2 and 3th underground, and all sections on the 4th underground floor are connected by one unit of the entire distribution team for commercial use and the entire part for apartment use, but all sections installed on the 5 and the 6th underground floor are connected by the entire part for apartment use, and all sections installed on the 5 and the 6th underground are divided and measured from the power distribution team for apartment use and the entire part for apartment use (the evidence No. 11 and 12 of the A, the witness J testimony, and the result of the on-site inspection of this court). The first instance judgment of the court of first instance is as follows.

[2] The result of the appraisal of the fees for appraiser K.

arrow