Text
The defendant shall order the plaintiff each point of the attached Form 1 through 6, and 1, among the area of 942 square meters of the D factory site in Yangju-si.
Reasons
1. Basic facts
A. The Plaintiff is the owner of a D 942 square meters of land for a factory (hereinafter “instant land”) in Yangju-si, and the Defendant is the owner of E large 1401 square meters and its ground buildings (hereinafter “instant building”).
B. Of the instant land, a stone shed and block fence, which are part of the instant Defendant building, are installed on the ground with 11 square meters in line with each point of 11 square meters in line, 7 through 9, and 7 different points in the indication of the relevant drawings, among the instant land, connected in line with each point of 11 square meters in line with the indication of the attached drawing.
[Reasons for Recognition] A without dispute, entry of evidence No. 1, the result of the request for surveying and appraisal by both main offices of the Korea Land Information Corporation, the purport of the whole pleadings
2. According to the facts of the above recognition, the defendant is obligated to remove stone embankments and blocks installed on the ground of each unit of the instant unit of land and deliver each unit of land of this case to the plaintiff.
3. In conclusion, the plaintiff's claim against the defendant of this case against the defendant is justified, and it is so decided as per Disposition.