(영문) 서울행정법원 2019.11.08 2018구합84553
관리처분계획변경인가처분취소
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of the lawsuit include the part resulting from the supplementary participation.

Reasons

1. Details of the disposition;

A. (1) On June 23, 1993, the Mayor of Seoul Special Metropolitan City: (a) On June 23, 1993, the Plaintiff I Co., Ltd., the Plaintiff I is the Nonparty (see the third side of the complaint); (b) in full view of the respective entries of the corporate register of Plaintiff I, the Plaintiff I, who was an existing project operator, and the Nonparty, the “stock I,” which was the existing project operator, may recognize the facts identical to the Plaintiff I. (hereinafter “Plaintiff I”).

) The Seoul Jongno-gu K and 61 7,055 m220,000 m2,052,000 m2,000 m2,000

hereinafter referred to as “instant zone”

(2) Article 12 of the former Urban Redevelopment Act (wholly amended by Act No. 5116 of Dec. 29, 1995), which newly constructs business facilities, etc. of the 18th and the 7th underground floor size of the project district (hereinafter “instant project”) with regard to “L redevelopment project” (the implementation period between June 23, 1993 and December 22, 1996; hereinafter “former project implementation authorization”).

(2) On June 29, 1993, after the Seoul Special Metropolitan City public notice M&M publicly announced on March 27, 1995, the Seoul Special Metropolitan City public notice of N&M was publicly announced on March 27, 1995. 2) Plaintiff I selected O Co., Ltd. as a contractor and started the project and commenced the project of this case. Since then, it was impossible to implement the project of this case due to the failure of O, etc., Plaintiff I prepared a written agreement (No. 1) with the P Co., Ltd. (hereinafter “P”) on February 21, 200, and transferred “the instant project implementation right and all rights”.

The indication of a written agreement (BB No. 1): The construction size of the instant project: With respect to the downtown redevelopment project on the surface of the 7th underground floor, the 7th ground floor, the 7,052.4 square meters of the enforcement area of the 18th floor (main complex building), the total floor space of 58,821.68 square meters, the Plaintiff I and the project developer, who are the present project developer