logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 제주지방법원 2011.08.17 2011고단318 (1)
폭력행위등처벌에관한법률위반(집단ㆍ흉기등상해) 등
Text

A defendant shall be punished by imprisonment for not less than eight months.

except that the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

[201No. 318] On April 6, 201, the Defendant, along with E, performed relief, such as the use of handb cards, singing, or the “construction, to oppose the construction,” at the site of Section 1 in the Jeju Sea Base Construction Project, which is located in Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, and the victim F, a company, engaged in the use of G strings and the installation of concrete block strings for the construction of Jeju Sea Base, and prevented the above strings from moving to the installation work. The Defendant, at the left bottom of the above strings, carried out reliefs, such as the use of hand cards, singing, or the “construction, to the contrary,” from May of the same day.

Accordingly, the Defendant conspired with E to interfered with the construction work of Jeju Naval Base Corporation F by force over about one hour and twenty-five minutes.

[2011 Highest 511]

1. On May 19, 201, around 08:10 on May 19, 201, the construction site for the construction site for the construction site for the construction site of the Jeju Naval Base Construction Work, Section 1, which is located in Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, the Defendant, H, I, J, K, K, L, M, N, andO, was conducting ground flat work for the construction of the road necessary for the construction of the extraction site where the straight line can be connected by using the digging method under the supervision of the head of the victim P.

At this time, the Defendant was placed on the front of a vinyl structure installed in front of the excavation season, and the rest of the above people interfered with the construction work of Q&A by force over about one hour and 50 minutes from around 10:0 of the same day by putting them on the scke, sitting on a road, putting them on a banner, putting them with a banner, or putting them on the sckes or brings structures by sticking them on the sckes or ballon structures.

2. On May 18, 201, at the site of Section 2 of the Jeju Naval Base Construction Work in Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si on May 18, 201, the Defendant, H, I, J, and K’s co-principal structures installed in the TPP (a concrete structure installed in a breakwater, etc.) under the supervision of the victim R (on-site manager of F2 Section).

arrow