logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 제주지방법원 2011.11.23 2011고단617
업무방해
Text

Defendant

A, G and R Imprisonment for 8 months, Defendant K for 10 months, Defendant L for a fine of 3,00,000 won, Defendant M, N.

Reasons

Punishment of the crime

"2011 Highest 617"

1. On May 19, 201, around 08:10 on May 19, 201, Defendant A, Defendant G, Defendant K, Defendant M, Defendant N, Defendant N, and Jeju Jeju Naval Base Construction Work, which is located in Seopodong-si, Seopo-si, Seopo-si, Seopo-si, and the 1st place of construction, the construction site was under the supervision of the victim T (U site manager) to build a road necessary to build a extraction site where the ground line can be connected by using an excavated machine.

At this time, V was placed on the front of a vinyl structure installed in front of the excavation period in the work, and Defendant A was bound by a vinyl structure installed by the Defendants to stay in the 쇠s, and Defendant G was lying under the bottom of the excavation period, and was lying under the bottom of the excavation period, and Defendant K was able to put up the steel structure of the plastic house in front of the plastic house, Defendant L, Defendant M, and DefendantO was seated on the front of the plastic house, Defendant N was seated on the front of the plastic house, and Defendant N interfered with the construction work of U corporation by force over about one hour and 50 minutes from around the same day by 10:00 on the same day.

2. On May 18, 201, around 07:30 on May 18, 201, Defendant A, G, K, and Defendant L engaged in manufacturing operations of TTPP (specific structures installed in a breakwater, etc.) under the supervision of the victim WW (on-site manager of X 2 construction sections) at the second construction site of the Jeju Naval Base Construction Work in Seopo-si, Seopo-si.

At this time, V and Defendant A got up on the boom boom boom boom boom boom boom boom boomed the banner stating “I need to suspend the construction of military bases, environment and peace,” and prevented the maintenance of concrete pumps by using handbrid micros.

Accordingly, Defendant G and Defendant K had prevented the supply of ready-mixeds by entering concrete pumps and ready-mixed spaces, and Defendant L is concrete.

arrow