logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 2015.05.14 2014나102799
손해배상(기)
Text

1. The appeal of the Plaintiff (Appointed Party) and the claims of the Appointed A, AD, AK, AL and BC expanded in the trial of the Party are all dismissed.

Reasons

(c) Electric charges used in incidental facilities and welfare facilities, such as street lamps, underground parking lots, and management offices, shall be comprised of electric charges, and the actual expenses for each month shall be allocated according to the housing supply area;

Electricity rates for general use, industrial use, street lamps shall be classified, but elevator electric charges shall be excluded.

When a surplus occurs, it may be replaced by a joint electricity charge or a joint water supply charge after disposing of it as a dynasium.

The cost actually required for each unit of a flag before the entrance (in cases where a measuring instrument classified by unit is installed), shall be excluded from not more than two floors (in cases of the use of the second floor, it shall be imposed) and divided into the number of households concerned.

[Attachment 5] Methods of calculating common user fees (related to Article 62(1)); Methods of calculating the amount to be borne by each household.

1. The monthly usage of each household shall be calculated in accordance with the terms and conditions of the supply of electricity of the Korea Electric Power Corporation only for multi-family housing for which the management entity collects electricity charges from occupants, etc. and pays them to the Korea Electric Power Corporation;

* The management body shall select the method of payment favorable to occupants, etc. from among the "comprehensive contract apartment (low pressure for house) or single contract apartment (high pressure for house)" and enter into a contract with the Korea Electric Power Corporation.

KBS TV license fees to be integrated and notified to the Korea Electric Power Corporation in the Electric Power Corporation notice shall be calculated separately from electricity fees.

[Attachment 6] Calculation Method (Related to Article 62 (2) / [Attachment 6] / Non-contentious facts, Gap's evidence Nos. 1 through 3, 10, 12, 19, Eul evidence Nos. 1, 6, 7, and 9 (which includes a serial number; hereinafter the same shall apply), and the ground for the plaintiff's claim as a whole, the collection of the electricity fee for each household by the plaintiff's assertion on behalf of the Korea Electric Power Corporation, which is the collecting authority, for the convenience of the plaintiffs, who are occupants, pursuant to the Housing Act-related provisions, cannot be collected in excess of the electricity fee for each household actually used by the plaintiffs.

Nevertheless, the defendant and the defendant.

arrow