logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 동부지원 2015.05.20 2015고단76
사기등
Text

Defendant

A Imprisonment with prison labor for eight months, for one year, and for six months, for each of the defendants C.

except that this shall not apply.

Reasons

Punishment of the crime

1. Defendant A requested the purchase of miscellaneous goods, which are steel products used for manufacturing stairs, steel ladders, etc., from Hyundai ethyl Industry (hereinafter “Korea Power Plant”) operated by Hyundai ethyl Industries (hereinafter “Korea Power Plant”) 1 and 2, etc., to deliver certificates of inspection of the original materials, in line with the purchase specifications, Defendant A tried to arbitrarily modify the contents of the above certificate of inspection in line with the purchase specifications, and to obtain sales proceeds by submitting it as if the above certificate of inspection was issued in a normal manner.

Around January 28, 2008, the Defendant altered a private document by changing the name “KSM A3504 SDR400” into “ASM A36,” and changing the name “the name “the title “the document document” into “the original document” into “the document,” and changing one copy of the inspection certificate under the name of the Dong international lecture from January 28, 2008 to October 14, 2009, as indicated in the attached list 1 of the crime list from January 28, 2008.

B. The Defendant, on January 30, 2008, supplied miscellaneous articles to an employee who is not aware of the name of modern construction (ju) in the reported Ri/U.S. military power plant located in the head of the Busan District Office, the Defendant is named as the same private document, which is a private document regarding the certification of facts altered under Paragraph (a).

arrow