(영문) 의정부지방법원 2013.07.09 2013고단889 (1)
특수절도등
Text

A defendant shall be punished by imprisonment for one year.

Reasons

Punishment of the crime

On August 20, 2010, the Defendant was sentenced to four months of imprisonment with prison labor for a violation of the Road Traffic Act (unlicensed Driving) at the District Court of the Republic of Korea on August 20, 201, and completed the execution of the sentence in a medical prison on November 21, 2010.

"2013 Highest 889"

1. On February 2013, the Defendant conspired to steal construction materials, such as rain pipes, etc., located at the construction site in C, D, and C, and C, D, and C, E, at the Namyang-si, to take charge of driving the vehicle by preparing freight vehicles to transport stolen objects, and C, together with the Defendant, preparing tools necessary for committing the crime, such as freight vehicles, and selling stolen objects to F, an operator on the water surface, together with them;

A. On February 23, 2013, at the construction site located in G in Namyang-si, Namyang-si, the victim I was found to have no person at the construction site at the H level, and the victim I prepared to carry 60 non-meter pipe 60,000 won of the market price managed by the victim I at the construction site at the construction site as above, and theft them into the J 1 ton cargo vehicle;

B. At around 21:00 on March 24, 2013, at the same place as paragraph 1(a) of Section 1, carrying 30,000, the sum of the market prices of the victim I managed by the victim in the same manner as at the same time, and carrying 60,000, a pipe of 60,000 plugs of the 6-meter plug, equivalent to the total market price of the victim I, into the above cargo

C. On March 31, 2013, around 22:00, at the construction site of electric power plant located in K at Nam-si, Namyang-si, and in the same manner as paragraph (a) of Article 1, the victim M located at that construction site in the same manner as paragraph (a) steals 60,000 won in total, 60,000 won in 60,000,000 won in the market value of the victim M of the construction site, and approximately KRW 70,000,000 in 6,000, 60,000

D. Around 21:00 on April 2, 2013, at the construction site of “O” located in N in Namyang-si, Namyang-si, and in the same manner as paragraph (a) of paragraph 1, 60 of this Article, the victim P, located at the construction site, carries 90,000 won of the market price managed by the victim P, and steals them into the cargo vehicle;

2. The Defendant,

(a) the Southern-si, 23:00 in order of February 2, 2013.

arrow