(영문) 의정부지방법원 2013.06.18 2013고단889
특수절도등
Text

Defendant

A and B Imprisonment with prison labor for 10 months, and Defendant C shall be punished by a fine of 3,00,000 won.

Defendant

C The above fine.

Reasons

Punishment of the crime

1. Defendant A and B conspired to steal construction materials, such as non-line pipes, located at the construction site in Namyang-si, Namyang-si, 2013, and Defendant B conspired to steal the construction materials at the construction site in the Namyang-si, 2013; Defendant B, preparing to transport stolen materials and driving the vehicle; Defendant A, along with Party E, prepared tools necessary for committing the act of transport of stolen materials; and Defendant A, together with Party E, sold the stolen materials to C, who is an operator of the high water level;

A. On February 23, 2013, at the construction site located in G in Namyang-si, Namyang-si, the victim I was found to have no person at the construction site at the H level, and the victim I prepared to carry 60 non-meter pipe 60,000 won of the market price managed by the victim I at the construction site at the construction site as above, and theft them into the J 1 ton cargo vehicle;

B. At around 21:00 on March 24, 2013, at the same place as paragraph 1(a) of Section 1, carrying 30,000, the sum of the market prices of the victim I managed by the victim in the same manner as at the same time, and carrying 60,000, a pipe of 60,000 plugs of the 6-meter plug, equivalent to the total market price of the victim I, into the above cargo

C. On March 31, 2013, around 22:00, at the construction site of electric power plant located in K at Nam-si, Namyang-si, and in the same manner as paragraph (a) of Article 1, the victim M located at that construction site in the same manner as paragraph (a) steals 60,000 won in total, 60,000 won in 60,000,000 won in the market value of the victim M of the construction site, and approximately KRW 70,000,000 in 6,000, 60,000

D. Around 21:00 on April 2, 2013, at the construction site of “O” located in N in Namyang-si, Namyang-si, and in the same manner as paragraph (a) of paragraph 1, 60 of this Article, the victim P, located at the construction site, carries 90,000 won of the market price managed by the victim P, and steals them into the cargo vehicle;

2. Defendant C is a person who is engaged in the water trading business under the trade name of Q from Nam-si in Southyang-si;

A. At 00:00 on February 2, 2013, the victim I, who stolen from E on the above secondhand on the water surface at around 00:0, has a 60-meter pipe equivalent to KRW 9.60,000 in the market value of the victim I owned.