logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원김천지원 2014.05.16 2012가합1064
손해배상(기)
Text

1. The Defendant: (a) KRW 20,00 per annum from May 8, 201 to May 16, 2014, respectively, to the Plaintiffs; (b) KRW 5% per annum.

Reasons

1. The following facts may be acknowledged, either in dispute between the parties or in full view of the respective entries and arguments set forth in Gap evidence 1-1 to 4, 33, 34, 59, 60, 179 through 182, 193 through 201, and the whole purport of arguments set forth in Gap evidence 2:

(1) The plaintiffs have a place of business of restaurant, beauty art room, and medication-support business in the old, si and Maldong-gun.

Dodice Defendant is a wide-area waterworks business operator who supplies tap water to Gu and Si pursuant to the Water Supply and Waterworks Installation Act, the Water Supply and Waterworks Corporation Act, the Korea Water Resources Corporation Act, the Water Supply and Waterworks Corporation Act, etc. for the purpose of contributing to improving the people's lives and promoting public welfare by developing and managing water resources comprehensively.

B. The Defendant supplied tap water to the residents, including the Plaintiffs, through the drainage pipe, after collecting and treating the water from the flow pipe from the flow pipe of seawater, and supplying the tap water from the flow station to the flow pipe, the four Corporation drainage station, the tidal wave drainage station, the mountain pressure station, and the discharge pipe. The water supply system for the water from the flow station of the Gu-U.S. wide-area waterworks is as shown in the annexed Form 1.

In 198, 1998, the flusium drained water was installed in the area where the Gu and the Gu had been managed. Since the flusium had no connection road between the flusium and the flusium at the time, it was impossible to build a direct transmission pipe because the flusium was installed in the form of receiving tap water from the flusium drainage area, and the flusium was installed in the form of receiving an allocation of tap water from the flusium, and the area managed by the llusium, which was managed by the llusium, entered into an agreement with the llusium on June

C. The Gu and the defendant, upon entering into an agreement, supplied the water supply system of the Jindong Han River around November 2009.

arrow