Text
1. The defendant stated 20,000 won for each of the plaintiffs and the corresponding stated "date of calculation" in the attached Table 2.
Reasons
1. Facts of recognition;
A. The plaintiffs are corporations established under the Korea Water Resources Corporation Act for the purpose of contributing to the improvement of people's lives and the promotion of public welfare by facilitating the supply of water for living and improving water quality through the comprehensive development and management of water resources, which are wide-area waterworks business operators who supply tap water to Gu and Si under the Water Supply and Waterworks Installation Act, the Korea Water Resources Corporation Act, and the Water Supply and Waterworks Corporation Act.
B. The Defendant supplied tap water to the residents of the Gu, including the Plaintiffs, through the drainage pipe from each of the above drainage stations. The water supply system of the Gu-U.S. metropolitan water supply area is as shown in the annexed Form 3. The water supply system of the Gu-U.S. metropolitan water supply area is as shown in the annexed Form 3.
In 198, 1998, the flusium drained water was installed in the area where the Gu and the Gu had been managed. Since the flusium had no connection road between the flusium and the flusium at the time, it was impossible to build a direct transmission pipe because the flusium was installed in the form of receiving tap water from the flusium drainage area, and the flusium was installed in the form of receiving an allocation of tap water from the flusium, and the area managed by the llusium, which was managed by the llusium, entered into an agreement with the llusium on June
C. Around November 2009, the Si and the Defendant entered into an agreement with the following contents (hereinafter “instant agreement”) for the smooth promotion and stable supply of water for the establishment of a water supply system in the Jung-dong River area (a metropolitan area or Gu-U.S.).
Article 7 (Water Supply and Demand Plan, etc.) (1) The defendant and the Gu and the Gu and the Gu are all and all of the projects according to the results of mutual consultation and implementation design.