(영문) 서울중앙지방법원 2013.11.05 2012가단297259
소유권이전등기절차이행
Text

1. On the Plaintiff (Counterclaim Defendant),

A. The defendant (Counterclaim plaintiff) B is marked on the attached sheet 11. The attached sheet 11.

Reasons

1.The following facts may be found either in dispute between the parties or in the entries or videos of Gap evidence 1 to 9, Eul evidence 1 to 5, together with the purport of the whole pleadings:

As the Plaintiff’s telegraph as the Plaintiff’s representative, I maintained the property of an incorporated foundation, which was carried out by H, owned by Defendant C, by the law houses and buildings on the land owned by Seongbuk-gu Seoul Metropolitan Government JJ large 625 square meters and the State.

Defendant C filed a lawsuit against the property of the Foundation for the removal of a building on the ground of the said J in accordance with the judgment, and executed the removal of the building on the ground of the said J in accordance with the said judgment. On February 9, 1983, Defendant C, while selling the said J land to H, etc., removed the said steel network and constructed a cement fence on the line between the said J land and the said J land, as the ownership of Defendant C was in line with the said J land, and the said J land was owned by Defendant C, which was adjacent to the lower part of the said J land, with a size of 52 square meters and 241 square meters on the land attached to 12, 17, 18, and 6 attached Table 12, 17, 18, and 6 attached Table on the ground of the land adjacent to the lower part of the said J land.

After that, around September 17, 1990, the plaintiff was donated the above J land from H, etc. and used it as a temple site, and newly constructed a end angle in 191, and on September 15, 2005, the plaintiff newly built the building of three-story inspection on the above J and one parcel on the ground.

In the order of each of the items in the attached Table 11, 12, 17, 10, and 11, an appraisal part of each of the above types of 45 square meters was installed on the ground of 7 square meters in part of the above 45 square meters in a ship connected with each of the items in the attached Table 1, 12, 17, 10, and 11 among the 45 square meters in the attached Table 1, 2, 7, 8, 9, and 11, and the above 45 square meters and the attached appraisal part of each of the above 45 square meters in the attached Table were installed on the ground of 7 square meters in the attached Table 2, and the above 46 square meters in the ship connected each of the above 45 square meters in the attached Table 1, 12, 17, 18, and 9 are also connected with each point in the same order. The cement fence of the above 333 square meters in the aggregate (hereinafter referred to as "the above real property").