(영문) 대전지방법원 2015.08.12 2013구합2862
손실보상금
Text

1. The instant lawsuit shall be dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. In around 2009, the Plaintiff entered into a loan agreement with the State-owned property from March 1, 2009 to December 31, 2010, with respect to the lease period for the land of 3,483 square meters (which was divided into B river 64 square meters and C river 3,419 square meters, respectively) and D river 1,459 square meters (hereinafter “each of the instant lands”).

around that time, the Plaintiff planted 159 weeks of pine trees (hereinafter “instant pine trees”) on each of the instant land, and entrusted the management thereof to E (F).

1. Objectives and outline of the project;

(a) Enhancement of national level of leisure and culture of the people and improvement of the quality of life, such as the maintenance of rivers for the creation of sound aquatic ecosystems, improvement of waterside accessibility, water-related leisure activities, etc., as projects for the revitalization of the regional economy, towing of water management and global scale of water management, by strengthening the ability to cope with future water shortage, droughts, safe realization of river water quality, and restoration of rivers;

(b) The one form (1,50kW x 2) of a power plant with a small number of power plants (1,500 km) in one form (400 km) in the multifunctional 1 (400 km) in 10,000 cubic meters of multifunctional river, an ecological river and river, the outline construction type of the project: One form of preferential construction;

2. The location and area of the place of project execution;

(a) Location total operations - Coordinate - Woo in Chungcheongnam-si, Chungcheongnam-Nam-si, Chungcheongnam-do: Pilwon in Cheongju-do, Chungcheongnam-do, Woo-do; Woo-do, Chungcheongnam-do; Woo-do, Chungcheongnam-do; Woo-si, Chungcheongnam-do; Woo-do, Chungcheongnam-do; Woo

(b) Total area (extension): 26.30km for the portion approved for an implementation plan for a gold club: 635 thousand square meters;

3. Project period: November 2009 to December 201.

B. Around 2009, the Defendant established an implementation plan for G projects (hereinafter “instant public projects”) with the following contents pursuant to Article 10(1) of the Korea Water Resources Corporation Act, and obtained approval from the Minister of Land, Transport and Maritime Affairs, and the Minister of Land, Transport and Maritime Affairs announced it to H on November 16, 2009.

C. The Defendant around July 2012.