logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2016.04.20 2015누34306
과징금부과처분 등 취소 청구의 소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

The defendant alleged the claim against the plaintiff.

Reasons

1. Facts recognized;

A. The Plaintiff, etc.’s status as the Plaintiff, etc., Daewoo Construction (hereinafter “Treatment Construction,” and the name of another company is omitted in terms of convenience, and the indication of “stock company” is also omitted), Samsung C&T construction, KS construction, SS construction, gssc construction, large forest industry, and modern industrial development (hereinafter collectively referred to as “7 large construction companies”), joint construction, joint construction, scopic construction, scopic construction, scopic construction, Hanjin Heavy Industries, scopic construction, scopic construction, scopic construction, scopic construction, scopic construction, joint construction, scopic construction, scopic construction, scopic construction, scopic construction, scopic construction, scopic construction, scopic construction, scopic public construction, including the Plaintiff, etc., is a company engaging in construction business as stipulated in Article 21 of the Monopoly Regulation and Fair Trade Act (hereinafter “Fair Trade Act”).

B. A summary of construction work for the high-speed high-speed rail 1) The construction work for the high-speed high-speed rail 1) is a construction work for the high-speed rail 184.534m high-speed rail 184m in total length which is linked to the high-speed rail 184.534m in length. This is, along with the high-speed rail 1, a large-scale border 3,52.9 billion won project cost was invested for the construction work for the high-speed high-speed rail 19 construction work for the high-speed high-speed rail 2).

Of them, ① Section 1-1 and Section 3-2 are design and package deal projects; ② Section 1-2, Section 1-4, Section 2-3, and Section 4-2 are design and package deal projects; ② Section 1-2, Section 2-3 and Section 4-2 are alternative projects; ③ the remainder of 13 Section 13 and below.

The bid price of the said 19 sections was totaled of KRW 3.9,56.4 billion, and the bid price of the instant 13 sections was total of approximately KRW 2.4.4.

arrow