(영문) 서울중앙지방법원 2017.08.25 2016가합560204
변압기 및 물탱크 사용권 확인소송
Text

1. The plaintiff (appointed)'s claim is dismissed.

2. The costs of lawsuit shall be borne by the plaintiff (appointed party).

Reasons

1. Basic facts

A. The instant water supply and electric facilities installation process 1) Defendant, Nonparty C, D, E, and F jointly implemented the development project of the coal mine area development zone with the content of creating accommodation facilities, etc. in G G workers in Gangwon-do, and first, the Plaintiff, the owner of C, to newly build accommodation facilities on the ground of each land, such as Thai-si, H, I, J, D, K owned by the Defendant, and L owned by the Defendant, and registered as M on March 3, 201 (hereinafter referred to as “M’s joint business operators”), while the Plaintiff, C, D, E, and F was registered as a joint business operator on July 4, 201, and P was registered as a new joint business operator.

Section B. 'Joint Project Operators'

2) During the new construction process of the above accommodation, joint business operators owned 1/5 shares of the Defendant, C, D, E, and P, each of the N on the N on the land owned by the joint business operators at the time of Taecheon-si.

Around February 2012, a water supply construction application and a report on a plan for the construction of electric installations has been installed and electric facilities (hereinafter “instant water supply and electric facilities”) have been installed on the above NN land, such as water tanks and electric power supply facilities as indicated in the attached list, on the land.

3) Meanwhile, on June 18, 2012, the Defendant completed the registration of ownership transfer for the 4/5 portion of the land jointly owned on Taecheon-si N on the ground of dividing the jointly owned property on June 18, 2012, and the said N land became the sole ownership of the Defendant. B. The Plaintiff, etc. (1) acquired the ownership of each of the instant land and buildings by the Plaintiff, etc. (the appointed party; hereinafter “Plaintiff”) was awarded a successful bid for the I land and buildings on the I land in the voluntary auction procedure (Yancheon-si Branch Branch Branch of the Chuncheon District Court), and completed the registration of ownership transfer on April 30, 2015, Q Q.