logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 천안지원 2016.02.03 2015고합277
송유관안전관리법위반등
Text

Defendant

A and B shall be punished by imprisonment with prison labor for one and half years, and by imprisonment with prison labor for two years.

However, as to Defendant B, the same shall apply.

Reasons

Punishment of the crime

1. Defendant A and C’s joint criminal acts (Violation of Oil Pipeline Safety Control Act) were proposed to provide that “In the influent coffee shop located in Daejeon U.S., the oil pipeline work is defective along with the work of cutting oil from the oil pipelines, G et al.; the Defendant recruited on the ground and opened oil facilities; the Defendant recruited persons in charge of the field management to transport large oil in the initial capital amount of KRW 50 million; H recruited to take charge of the work of transporting large and large-scale oil necessary for this case.

According to the above public offering, Defendant C leased a warehouse in South-gu, South-gu, Dong-gu, where oil pipelines were buried at a place where the oil pipelines were buried, in order to install facilities to steal oil on the oil pipelines. Defendant C: (a) recruited an on-site manager A and recruited B; and (b) caused them to take charge of managing the said warehouse; and (c) Defendant A moved into the said Do-dong storage around August 10, 2015.

G and name boxes, from the end of August 2015 to the end of October 10 of the same year, enter 1.5m wide, 7.5m wide, 5m wide, and 1m wide, and 34m wide from the place to the place where the oil pipelines were laid underground, and from the point where the oil pipelines were installed and managed by the Korea Petroleum Management Corporation for the victims, connected 2 balls by drilling up two balls to the Rason and Hahnam, respectively, and connected Dozices from the office to the warehouse adjacent to the office building, and installed Dozys in the enclosed room of the above warehouse with a drainage rate of 66m wide, and installed Doys and facilities necessary for purchasing Doys and facilities such as pressure and facilities to verify whether oil was oil being oil being oil being oil being oil being oil being oil being oil oil being oil oil being conveyed to the Do's paper and oil pipelines inside the above warehouse, and Defendant 200.5.25.25.

arrow