(영문) 서울중앙지방법원 2017.01.24 2016고합369
송유관안전관리법위반등
Text

A defendant shall be punished by imprisonment for four years.

Seized evidence referred to in subparagraphs 1 through 21 shall be confiscated.

Reasons

Punishment of the crime

around May 2015, the Defendant: (a) excavated the land where the pipelines were laid from C to connect them to the pipeline; and (b) consented thereto; and (c) provided necessary funds to enable C and persons in distress to excavate the land; and (d) in collusion with D, E, F, etc. to sell petroleum on the oil pipeline.

Pursuant to such a public contest, C installs oil facilities on the oil pipelines buried underground after excavation using excavation equipment, etc., D prepares the president of G oil station at the place where he sells limited petroleum, and the Defendant et al. deducts petroleum through the oil pipe installed after excavation.

In other words, E and F, an employee, have been operated to transport the oil tank to the G gas station of the defendant.

1. According to the above public offering, C and nameless boxes were excavated on September 2015, 201, on the open container box located in Heung-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-do, with a large amount of 5 meters wide width, vertical length, and depth, and installed hydrostatic machinery using a string machine. They connected 80cm in diameter and 6 meters in length to the end point in I underground by passing through the Gyeong-gu highway where the pipelines are buried, and 80cm in diameter, and 6 meters in length to the end point in I underground, using 11 iron tubes of the length of 70 meters in length, excavated into the oil pipeline, and installed a string (dok valves) adjacent to the oil pipeline, and then installed a string, etc. to make the aforementioned equipment excavated, etc., and the Defendant C and others were provided with the aforementioned equipment to be installed during the work.

Accordingly, the Defendant, in collusion with C and influorites, installed facilities to steal oil on oil pipelines.

2. On September 24, 2015, the Defendant and his name winners C in the same manner as that of the foregoing paragraph 1.