(영문) 대구지방법원김천지원 2015.08.27 2013가단12521
전기공사대금(물품대금)
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts - Down-

1. Name of the construction project: The electric construction project to be conducted by the bankruptcy bank;

2. Contract amount: Amount of million won for the sale of daily gold (82,000,000) (VAT).

3. Construction period: (a) from April 1, 2013 to May 4, 2013 to May 31, 2013, 2013; (b) in order to enter into a contract for the said construction separately from the Han-ro deposit and pre-use inspection expenses, the term “A” means “A” and the term “B” means “A”.

Article 1 (Construction and Completion) “B” shall perform the construction in a solid and accurate manner in accordance with the specifications of the design drawings and estimates presented by “A”, and shall construct and transfer the facilities to be inspected in accordance with the specifications of the design drawings and estimates presented by “A” and the Korea Electric Power Corporation’s Standards Ordinance and Electrical Construction Technology Ordinance.

Article 3 (Change and Suspension of Design) Any change in the design of a construction project shall be increased or decreased by both "A" and "B", and "B" shall not be used for the purpose of transferring or pledgeing the construction project without the approval of "A" and shall not be suspended or cancelled.

(Provided, That if “B” fails to comply with the preceding paragraphs of Articles 1, 2, and 3, “B” may unilaterally terminate.

Article 4 (Permission and Other Stenographic Procedures) “A” shall act on behalf of the Korea Electric Power Corporation, the Electric Safety Corporation, and other duties.

Article 5 (Method of Payment for Construction Funds) “A” shall pay the construction price (82,00,000) to “B” as follows:

Down Payment: 40% of the contract price [1,000,000 won in daily gold 32,800,000 won in KRW 32,000)] intermediate payment: 40% of the contract price [40% of the contract price [32,80,000 won in daily gold 32,000,000 won in KRW 32,80,000 in KRW 5AT] Balance: the date and time of cash payment after transmission [1,00,000 won in daily gold 16,40,000 won in KRW 5AT]

A. On April 1, 2013, the Plaintiff entered into a contract for construction works (hereinafter “instant contract”) with the Defendant as follows.

B. The Plaintiff, pursuant to the instant contract, on April 2013.

arrow