(영문) 수원지방법원 2014.07.03 2013고정1992
업무방해
Text

Defendant

A shall be punished by a fine of 700,000 won, and a fine of 500,000 won, respectively.

The above fine is imposed against the Defendants.

Reasons

Punishment of the crime

1. Joint crimes committed by the Defendants

A. On October 17, 2012, from around 09:00 to around 14:00, the Defendants conspired to demand suspension of new construction and compensation to the victim F at the scene of E-type and new construction works located in Suwon-gu, Suwon-si, Suwon-si, for the installation of a new soundproof wall, by entering the same site where the victim F (ju) is in progress for the removal of the block fence for the installation of a provisional soundproof wall, and Defendant B was in front of the said equipment to prevent the operation of the white ray, which is the removal equipment, and Defendant A interfered with the victim’s work by force, such as entering the said construction site and resisting.

B. From October 18, 2012 to 15:00 on October 18, 2012, the Defendants conspired and set up a dump truck at the entrance of Defendant A at the construction site and at the construction site, and Defendant B interfered with the victim’s work by force, such as preventing the operation of sumkes on the side of the scarke at the construction site.

2. Defendant B

A. At around 15:00 on November 9, 2012, the Defendant intruded into a temporary structure on the ground that the victim H located in Suwon-si G, Suwon-si, and the victim H, would demand suspension of construction of the said hospital and compensation therefor. (2) On November 23, 2012, the Defendant invaded into a temporary structure on the ground that the Defendant, at around 09:30 on November 23, 2012, the instant E-type and the instant E-type and the instant paragraph (1) 1, up to the first floor width, in order to demand suspension of construction of the said hospital’s new structure and installation of a new structure: (3) around 16:00, on the ground that the Defendant, at the above E-type and E-type and the instant paragraph (1) 1) installed the victim’s wall installed at the site of new installation and installation of a new structure: from around 10:30 on November 26, 2012 to the date of installation of a new structure.

arrow