Text
Defendant
A Imprisonment for one year, Defendant B shall be punished by a fine of KRW 700,000, and Defendant C shall be punished by a fine of KRW 2 million.
Reasons
Punishment of the crime
[Criminal Power] On July 21, 2010, Defendant A was sentenced to imprisonment with prison labor for a violation of the Act on the Aggravated Punishment, etc. of Specific Crimes, for a violation of the Act on the Aggravated Punishment, etc. of Specific Crimes, for a female branch of Suwon District Court on March 21, 2012; on October 17, 2012, Defendant A was sentenced to imprisonment with prison labor for a crime of larceny, etc.; on December 6, 2013, Defendant A was sentenced to imprisonment with prison labor for a violation of the Act on the Aggravated Punishment, etc. of Specific Crimes, for a female branch of Suwon District Court on March 21, 2012.
【Criminal Facts】
1. Defendant A
A. From around 13:00 on December 2, 2018 to around 14:00, the Defendant intruded into a structure by entering the factory within the “F” factory operated by the victim E, which is located in W, through a place where the fence is not connected for the purpose of cutting off electric wires installed in the factory. (2) From around 10:30 on December 2, 2018 to 11:30 on the lower order of December 2018 to the “F” factory operated by the victim in W, which is located in W, and coming into the factory through a place where the fence is not connected for the purpose of cutting off electric wires installed in the factory.
3) From January 1, 2019 to December 12:00, the Defendant: (a) entered a “F” factory operated by the victim in Singju City, which is located in D, through a place not connected to the fence to steal electric wires installed in the factory; (b) was stolen by the Defendant, from around 13:00 on December 12, 2018 to around 14:00, the market price of the “F” factory operated by the victim in SM5 in SM5, which was installed in the factory using the gap in which the victim shuts down the factory and monitors the factory.
2. On December 2, 2018, the Defendant, from around 10:30 to around 11:30, at a “F” plant operated by the victim in Sriju-si, the victim is under surveillance after closing the factory.