Text
1. The plaintiffs' claims against the defendants are all dismissed.
2. The costs of lawsuit are assessed against the plaintiffs.
Reasons
1. Basic facts
A. As to the area of 2832 square meters prior to G in Won-si, Plaintiff A and B are co-owners who completed the registration of ownership transfer on December 31, 1990 ( Plaintiff A-ownership share 8/14, Plaintiff B-ownership share 3/14), and Plaintiff C is co-owners who completed the registration of ownership transfer on December 1, 2005 (share 3/14).
B. The father of Defendant D’s father: (a) leased the part on the ship (b) part (c) of 43 square meters, which connects each point of 16, 17, 18, 19, 20, 20, and 16, among the areas of 2832 square meters in order from the Plaintiffs in the city of Won-si, and owned each building on the ground, which connects each point of 17, 21, 22, 23, 24, 18, 17, and 17, of the same drawings; and (b) the part (c) part (d) of the same drawings, which connects each point of 25,26, 27, 28, 29, and 25 square meters in sequence, among the areas of 2832 square meters in Seoul Special Metropolitan City, from the Plaintiffs.
[2] The above part of the land (hereinafter referred to as “instant land”) is “the instant one building,” and the above part of the land (c) is “the instant two buildings,” and “the instant two buildings,” and the above part of the land (d) is “the instant three land,” and “the instant three buildings,” and all of the land in the instant case 1, 2, and 3 are combined with each other and “each of the instant land,” and “each of the instant buildings 1, 2, and 3.”
The net H died in arrears during nine years from 2006 to 2014. D.
On April 25, 2014, Defendant D agreed with Plaintiff A to pay in installments the rent of KRW 11 million from May 25, 2014 to KRW 500,000 per month from May 25, 2014.
E. Defendant D paid the sum of 4.3 million won from May 24, 2014 to April 25, 2015, out of the rent agreed upon as above.
(g) In accordance with the above agreement, 6 million won should have been paid if the building was normally paid by April 25, 2015. Defendant E from July 18, 2014, and Defendant F from January 26, 2015, leased and occupied the building of this case 3 from each Defendant D.