Text
A defendant shall be punished by imprisonment for two years.
However, the execution of the above sentence shall be suspended for three years from the date this judgment became final and conclusive.
Reasons
Punishment of the crime
I. From April 27, 2009 to December 31, 2018, the construction project outlined “C” means the construction project of establishing a street Ban, including 11.729 km of the racing-si and E-Japanese Railroad, 12 (1,756 m) of a bridge, 7 of a tunnel (7,035m).
Around April 1, 2009, F awarded an order of KRW 176,968,00,000 of the construction cost, and three companies (65%) G Co., Ltd. (65%) H (25%) and I Co., Ltd. (15%) formed a consortium and contracted the above construction with F. Around May 1, 2013, J Co., Ltd and the above construction cost was subcontracted to KRW 45,238,647,30 of the construction cost.
During the process of the construction in J, due to the bankruptcy by the J on July 1, 2014, the construction was carried out under the direct management system of G, a main business company, from around that time to November 2, 2014. After November 3, 2014, G and K concluded a subcontract with the construction cost of KRW 34,901,207,00 for the civil works and structures works that were carried out by the formerJ between G and K, and between K and K on November 3, 2014.
On April 2009, supervision chain L(70%) and M(30%) were composed of consortiums and entered into a contract for supervision of liability of approximately KRW 6.8 billion between F, which is the ordering entity, and between F, which is the ordering entity.
Ⅱ From May 1, 2013 to July 1, 2014, the Defendant served as the site manager of the said C Construction Site by J, a subcontractor from May 1, 2013 to July 1, 2014. On July 1, 2014, J continued to work as the site manager and continued to work as the site manager under the jurisdiction of G, a defaulted contractor.
Since November 3, 2014, the Defendant served as the site warden of K who was subcontracted with the construction work after the J from November 3, 2014 to the present day, and approved the work schedule, work log, etc. of the construction site, and has overall control over the construction site work site, and has been in charge of the duties of keeping and managing the payment from G, a contractor, on behalf of J and K.
Ⅲ. Criminal facts
1. The N Tunnels (False Claim) is a fraud (900 meters in total length).