Text
Defendant
A shall be punished by a fine for negligence of KRW 2,000,000, and by a fine of KRW 4,000,000.
The Defendants respectively.
Reasons
Punishment of the crime
1. The construction project for the construction project for the construction project for the construction project for the second section of the construction project for high speed railroads (F) in the Seoul metropolitan area (hereinafter “construction project for the second section of this case”) is the construction project for the construction project for the construction project for the construction project for the second section of the construction project for each of the instant construction projects from January 3, 2012 to December 20, 2016, which is the 8.2 km of the main line of the G G-J-gu, Sungnam-si, Gyeonggi-do (KTX) and the 3.276 km of the tunnel for the metropolitan rapid railroad (MTX).
Construction of the 3-2 Section No. 3-2 Section Construction of the Seoul Metropolitan Area High-speed Railroad (F) is a construction project that newly establishes a street Ban at the 5.9km of the tunnel of the Haak-gu High-Speed Railroad (KTX) in the Gyeonggi-do, from January 3, 2012 to December 20, 2016, the 3-2 Section No. 3-2 Section 3-2 Section Construction of the Seoul Metropolitan Area (hereinafter “the construction of the 3-2 Section”).
2. Defendants and related persons work as the site warden of I Co., Ltd. (hereinafter “I”) who is the contractor of the instant 3-2 construction section from June 11, 2012 to February 10, 2015, Defendant A, as well as Defendant A, was in charge of the overall field work, including the determination of the specific details and methods of construction of the instant 3-2 construction section, the preparation of a detailed statement of intent, and approval.
Defendant
B From December 25, 2015, from around December 25, 2015 to the present 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2 Section 3-2
J is a person who, from January 2012, works as the chief of the I’s official duties to the present date, has been in charge of the work, such as the process management of construction works of the Section 3-2, the claim against the Korea Railroad Facilities Corporation, the ordering authority, etc.
From January 11, 2012 to July 31, 2012, K served as the director in charge of the instant Section 2 construction and the director in charge of high speed railroads in the Seoul metropolitan area of the Korea Railroad Facility Corporation, which is the place where the instant Section 3-2 construction works were ordered, and performed duties, such as construction management, supervision, supervision, etc. of each of the above construction sites. From August 1, 2012 to January 26, 2016, K served as the senior vice-director in the Seoul metropolitan area of the Korea Railroad Facility Corporation while performing duties as the construction management and each of the above construction works.